next up previous index
Next: Control of physics Up: Summary of GEANT Previous: Summary of GEANT

General control

KEY N I VAR Short descriptionCOMMON GINIT
HSTA 20 M LHSTA names of required standard histograms, see [BASE110]/GCLIST/Blank
OPTI 1 I IOPTI automatic optimisation of the geometry via GSORD/GCOPTI/1
RNDM 2 I NRNDM initial random number seed (2 words) /GCFLAG/0
RUNG 2 I IDRUN user run number /GCFLAG/1
IDEVT first user event number /GCFLAG/1
SORD 1 I ISTORD stack ordering flag /GCSTAK/0
TRIG 1 I NEVENT total number of events to process /GCFLAG/10000000
TIME 3 M TIMINT time left after initialisation (see Notebelow) /GCTIME/
TIMEND time required for termination /GCTIME/1
ITIME test every ITIMEevents /GCTIME/1

Note: the time allowed for the job after initialisation cannot be set by the user via the data record. To set the total time for the job the user should call the TIMEST routine at the beginning of the program before any call to GEANT routines. This variable in the data record has not been removed for backward compatibility.



next up previous index
Next: Control of physics Up: Summary of GEANT Previous: Summary of GEANT


Janne Saarela
Mon Apr 3 12:46:29 METDST 1995